Intake manifold ASSY (FA20): Reassembly
- INSTALL NO. 3 FUEL DELIVERY PIPE
- Install the No. 3 fuel delivery pipe to the intake manifold with the 3 clamps. (Transmission A/T)
- Install the No. 3 fuel delivery pipe to the intake manifold with the 2 clamps. (Transmission M/T)
- Fuel delivery pipe installation (bank 2 side)
- Apply gasoline to two new seal rings and install them to the fuel injector ASSY.CAUTION: Make sure there is no damage to or foreign matter in seal ring grooves of the injector.
- With the fuel injector ASSY installed on the fuel delivery pipe (bank 2 side), install it to the intake manifold.CAUTION:
- Be careful not to twist the seal ring.
- After it is attached to the fuel delivery pipe (bank 2 side), confirm that it can be rotated relatively lightly. If it cannot be rotated, remove the injector and repeat the work after replacing the seal rings with new ones.
- With 2 bolts, install the fuel delivery pipe (bank 2 side) to the intake manifold.
Standard value: T=19N.m {194kgf.cm} {14ft.lbf}
- Align the axis of the fuel delivery pipe NO. 3 connector and the axis of the pipe, connect them, and push the retainer until you hear the click.CAUTION:
- Before starting the work, check that there is no damage to or foreign material on the fuel delivery pipe NO. 3 connector and the pipe connection.
- After connecting fuel delivery pipe NO. 3, check that the fuel delivery pipe NO. 3 connector and the pipe are securely attached.
- Apply gasoline to two new seal rings and install them to the fuel injector ASSY.
- INSTALL FUEL DELIVERY PIPE (for Bank 1)NOTE: Use the same procedure described for the fuel delivery pipe (for bank 2).
- INSTALL CAP (for Automatic Transmission)
- Install the cap to the intake manifold.
- INSTALL PURGE CONTROL SOLENOID VALVE
- Connect the No. 1 fuel vapor feed hose to the intake manifold.
- Install the nut and purge control solenoid valve to the intake manifold.
Standard value: T=6.4N.m {65kgf.cm} {4.7ft.lbf}
- INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR
- Apply engine oil to the contact surfaces of the new O-ring on manifold absolute pressure sensor.
- Install a new O-ring to the manifold absolute pressure sensor.
- Install the manifold absolute pressure sensor to the intake manifold with the bolt.
Standard value: T=4.0N.m {41kgf.cm} {3.0 ft.lbf} (Transmission A/T)
Standard value: T=3.4N.m {35kgf.cm} {2.5 ft.lbf} (Transmission M/T)