Signal Circuit Inspection
- CHECK A/T control relay harness
- Ignition "OFF".
- Disconnect the "A/T CONTROL RELAY" connector.
- Measure the voltage between terminal "4" of the "A/T CONTROL RELAY" harness connector and chassis ground.
- Engine OFF → ON.
Specification: 12V is measured only for approx. 0.5sec
- Is voltage within specifications?
YES
- Go to 2"Check Supplying Power to solenoid valve" procedure.
NO
- Check for open in harness. Repair as necessary and Go to "VERIFICATION OF VEHICLE REPAIR " procedure.
- If signal circuit is OK, Substitute with a known-good PCM/TCM and check for proper operation. If the problem is corrected, replace PCM/TCM and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.
- CHECK Supplying Power to solenoid valve harness
- Ignition "OFF".
- Disconnect the "A/T CONTROL RELAY" and PCM/TCM connector.
- Measure the resistance between terminal "3" of the "A/T CONTROL RELAY" harness connector and terminal "49" and "50" of the PCM/TCM harness connector.
Specification : Approx. 0 Ω
- Is resistance within specifications?
YES
- Go to "GROUND CIRCUIT INSPECTION " procedure.
NO
- Check that A/T-20A Fuse in engine room junction is installed or not blown.
- Check for open in harness. Repair as necessary and Go to "VERIFICATION OF VEHICLE REPAIR " procedure.