LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2000 >> Contour L4-122 2.0L DOHC VIN 3 SFI >> Repair and Diagnosis >> Starting and Charging >> Charging System >> Alternator >> Testing and Inspection >> Generator Testing >> Load Test

Load Test

1. With the engine running, place the air conditioner in the ON position, if equipped, the blower motor on high speed and the headlamps on high beam.
2. Increase the engine speed to approximately 2000 rpm. The voltage should increase a minimum of 0.5 volt above the base voltage. If the voltage does not increase as specified, refer to Generator On-Vehicle Test. If the voltage increased as specified, the charging system is operating normally. Proceed to battery tests. Generator On-Vehicle Tests